G STRV-banner%20-%20small

Workshop Preparation

Workshop preparations continue. After moving to Shropshire in August 2016 the last 8 months have been spent turning a cowshed into a suitable workshop. This has involved:

    • Concreting the floor
    • Fitting extractor fan for a proposed spray booth
    • Insulating the walls
    • Cleaning/painting the rafters
    • Painting white emulsion on the walls (to keep the inside as light as possible)
    • Painting the floor
    • Installing an electric ring main
    • Installing LED strip lights
    • Building work benches
  • Still to do…
    • Installing a compressor and pneumatic airlines
    • Building a spray booth to prevent overspray filling the workshop
    • Phew!

Leave a Reply

Your email address will not be published. Required fields are marked *