April 2020

Antennae

I wanted to install some antennae on the fuselage before fitting the Rollover Bar. It wouldn’t be too difficult to access the inside of the fuselage with it in place, but easier with it not…



OP-43 Access Panel Installation

Having looked at the space and number of proposed Avionic boxes to fit into that space, I reckon I’m going to have to use the area in front of the F-01455 Sub Panel. So I…




38-12 to 13 Canopy Rails

One of the challenges with the canopy structure is deciding when and what to prime ready for riveting. So much involves partial assembly followed by match drilling & countersinking. Lots of countersinking is done AFTER…