43 – Engine Installation!
Removing from the box Obviously a hoist is needed to get this job done safely. Lycoming say: The hoist must have a capacity to lift a minimum of 750 lb (340 kg) Must be a…
Removing from the box Obviously a hoist is needed to get this job done safely. Lycoming say: The hoist must have a capacity to lift a minimum of 750 lb (340 kg) Must be a…
Sender Mount I am using the Aircraft Speciality hoses for all the engine connections, and they have produced a new routing for the PMAG configurations for those builders utilizing the Garmin avionics package with single…
Vertical Power PPS The Vertical Power PPS (Primary Power System) combines the functions of multiple high-current, electro-mechanical components into a single, solid-state device. I decided to locate it using the existing nutplates which had been…
Wing Tip Ribs The manual is vague when describing how to position these wing tip ribs … it talks about a “snug” fit without any distortion. After playing around with the fore/aft position, I selected…
I initially struggled to find a way to cut the nav light covers. But then I spotted my tin snips, which had been included in my initial tool order from Cleaveland, but which I hadn’t…