Workshop preparations continue. After moving to Shropshire in August 2016 the last 8 months have been spent turning a cowshed into a suitable workshop. This has involved:

    • Concreting the floor
      • Fitting extractor fan for a proposed spray booth
      • Insulating the walls
      • Cleaning/painting the rafters
      • Painting white emulsion on the walls (to keep the inside as light as possible)
      • Painting the floor
      • Installing an electric ring main
      • Installing LED strip lights
      • Building work benches
  • Still to do…
    • Installing a compressor and pneumatic airlines
    • Building a spray booth to prevent overspray filling the workshop
    • Phew!