43 – Engine Installation – Airflow Performance FM200

WD-00110 IO-390C Cables Bracket

IMG_7325

The EXP119 installation has a different cable bracket, which is bolted to the underside of the engine.

This is all very straightforward until you read the last sentence in the manual step:

“Torque the bolts per the Lycoming documentation”

Hmmm … !!

Many can be found in the corresponding Lycoming Series Engine Maintenance Manual or Installation and Operation Manual. If a value still alludes you, there is also a massive document … Lycoming SERVICE TABLE OF LIMITS AND
TORQUE VALUE RECOMMENDATIONS … but good luck!

FM200

IMG_7323

Our engine arrived with the Airflow Performance FM200 uninstalled, in a seperate box inside the crate.

There is a section in the relevant Lycoming Maintenance Manual about installing a Fuel Injector, and this mentions torque values for the attachment nuts.

But these really refer to the studs into the engine, and the EXP119 has a doubler already attached to these studs. This doubler has four studs, orientating the FM200 at a slight angle. This aligns the unit to enable access for the Throttle & Mixture cables from the bracket.

IMG_7324

Our FM200 arrived with the Throttle lever on the left side, but it’s easy to swap it to the right side which is necessary for cable access.

The upper lever is Mixture, the lower one the Throttle.

Throttle & Mixture Cables

IMG_7331

The cables route through the CT-00102 Double Spherical Grommet which was previously installed in the firewall.

This is a neat unit, and also leaves more space for wiring etc through the standard firewall penetration just above.

IMG_7330

The cables route easily to the EXP119 bracket.

IMG_7362

I found that the cable lengths from the bracket to the control levers were verging on being too long.

You can adjust them to be as short as possible by winding the cable attachment thread fully aft, and by screwing on the rod ends fully.

By doing this the throttle can be adjusted to provide a “cushion gap” in the cockpit, together with optimum geometry for the control lever across its travel.

Optimum geometry” means that halfway through the lever’s range of travel, it’s at 90º to the cable.

The lever can be set at any angle to achieve this, but as can be seen in this picture where the cable and lever are at fully rich, the mixture cable was still too long when set at the required angle.

IMG_7365

I solved this by trimming the very end of the cable threaded portion, allowing the rod end to be wound on another 1/8″ (it had bottomed out before using all the thread).

By winding the cable attachment at the bracket aft as much as possible, and by …

… accepting a slightly larger “cushion gap” at the mixture control knob in the cockpit, it just worked.

IMG_7366

3 comments on 43 – Engine Installation – Airflow Performance FM200
  1. Lew MacKechnie

    Hi Steve…I’ve made great use of your build documentation numerous tines as I progress on my RV-14A build. I’m at the point of installing the engine now and I’m wrestling with how to route all the wires associated with engine monitoring through the firewall. Using the two existing firewall ports is pretty tight for the number of wires plus control cables. I like the CT-00102 firewall grommet associated with the EXP119 installation since it frees up space it the other two ports. I don’t have the EXP119 upgrade. Do yo see any issues using CT-00102 with the original engine installation?
    Thx…

  2. Mark Albery

    Hi Steve. I’ve just been trying to get the spherical grommet fitted. Space is tight and you seem to need 3 hands to hold everything together. Any tips?

    1. Steve

      Hi Mark,
      I’m afraid I have no tips apart from perseverance! I too found it challenging, and remember several expletives. An extra pair of hands would have made things easier. Once together it seems really good.