Workshop preparations continue. After moving to Shropshire in August 2016 the last 8 months have been spent turning a cowshed into a suitable workshop. This has involved:
-
- Concreting the floor
- Fitting extractor fan for a proposed spray booth
- Insulating the walls
- Cleaning/painting the rafters
- Painting white emulsion on the walls (to keep the inside as light as possible)
- Painting the floor
- Installing an electric ring main
- Installing LED strip lights
- Building work benches
- Still to do…
- Installing a compressor and pneumatic airlines
- Building a spray booth to prevent overspray filling the workshop
- Phew!